Kayak Point Day Use Phase 2, Snohomish County, WA #PW-25-0495-SB - Specs - Appendix J As-Built Plans
COV Cover Sheet
IND Index
ABV Abbreviations
VIC Vicinity Map
EX-1 Existing Conditions
EX-2 Existing Conditions
SP-1 Site Preparation & Demolition
SP-2 Site Preparation & Demolition
SP-3 Site Preparation & Demolition Details
L-1 Grading Plan
Sheet 1
L-2 Grading Plan
L-3 Grading Plan
L-4 Enhanced Backshore Berm Cross Sections
L-5 Materials Plan
L-6 Materials Plan
L-7 Materials Plan
L-8 Layout Details
L-9 Layout Details
L-10 Layout Details
L-11 Layout Details
L-12 Layout Details
L-13 Irrigation Plan
L-13 Irrigation Plan
L-14 Irrigation Plan
L-14 Irrigation Plan
L-15 Irrigation Plan
L-15 Irrigation Plan
L-16 Irrigation Schedule
L-17 Irrigation Details
L-18 Irrigation Details
L-19 Planting Plan
L-20 Planting Plan
L-21 Planting Plan
L-22 Planting Schedule
L-23 Planting Details
L-24 Planting Details
L-25 Layout and Signage Plan
L-26 Layout and Signage Plan
L-27 Layout and Signage Plan
L-28 Signage Details
L-29 Signage Details
G1.1 General Notes
G1.2 General Notes
C1.0 Boat Ramp Plan
C1.0 Boat Ramp Plan
C1.1 Boat Ramp Plan and Sections
C1.2 Boat Ramp Sections
C1.3 Boat Ramp Details
C1.4 Debris Deflector Plan & Section
C1.5 Concrete Approach Wedge Plan and Sections
C1.6 Concrete Approach Wedge Hinge Details and Sections
C1.7 Existing Pier Repair Plan
C1.8 Existing Pier Repair Plan
C1.9 Existing Pier Repair Sections and Details
C1.10 Existing Boardwalk Abutment Sections and Details
C1.11 Existing Pier Railing and Boardwalk Abutment Sections and Details
S-0 General Notes
EX-1 Existing Conditions
S-1 General Plan View
S-2 Plan & Elevation Views
S-3 Plan & Elevation Views
Sheet 1 Final Pier Alignment
S-4 Connection Details
S-5 Connection Details
S-6 Connection Details
S-7 Connection Details
S-8 Finished Features Plan & Details
S-9 Finished Features Plan & Details
C2.1 Erosion / Sedimentation Plan
C2.2 Erosion / Sedimentation Plan
C2.3 Erosion / Sedimentation Plan
C2.4 Erosion / Sedimentation Plan
C2.5 Erosion / Sedimentation Control Details
C3.1 Water Plan
C3.1 Water Plan
C3.2 Water Plan
C3.2 Water Plan
C3.3 Water Plan
C3.4 Water Plan
C3.5 Water Details
C4.1 Storm Drainage Plan
C4.2 Storm Drainage Plan
C4.3 Storm Drainage Plan
C4.4 Storm Drainage Details
C5.1 Sanitary Sewer Plan
C5.2 Sanitary Sewer Plan
C5.3 Sanitary Sewer Plan
C5.4 Sanitary Sewer Plan
C5.5 Sanitary Sewer Details
E-0.1 Electrical Demolition Plan
E-0.2 Electrical Demolition Plan
E-0.3 Electrical Demolition Plan
E-0.4 Electrical Demolition Plan
E-1.1 Electrical Layout Plan
E-1.2 Electrical Layout Plan
E-1.3 Electrical Layout Plan
E-1.4 Electrical Layout Plan
E-3.1 Electrical Details
E-3.2 Electrical Layout Plan - Detail Plan