Thomas' Eddy Hydraulic Reconnection, Snohomish County, WA #RR43063, WC3063, UPI 24-0016 / PW-25-0595SB - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 594 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Notice of Call for Bids
Page 6 Vicinity Map
Page 7 Summary of Quantities
Page 10 Introduction / Special Provisions / Project Proposal
Page 12 Contents
Page 19 Introduction / Special Provisions
Page 20 Introduction to the Special Provisions / Division 1 General Requirements
Page 76 Division 2 Earthwork
Page 93 Division 3 Aggregate Production & Acceptance
Page 94 Division 4 Bases
Page 96 Division 5 Surface Treatments & Pavements
Page 108 Division 6 Structures
Page 128 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 130 Division 8 Miscellaneous Construction
Page 155 Division 9 Materials
Page 176 Prevailing Wage Information
Page 177 Benefit Code Key
Page 195 Supplemental to Wage Rates
Page 206 Washington State Prevailing Wage Rates - Snohomish County
Page 253 Project Proposal
Page 284 Appendix A Geotechnical Engineering Report
Page 352 Appendix B Permits
Page 479 Appendix C Stormwater Pollution Prevention Plan
Page 515 Appendix D Inadvertent Discovery Plan
Page 535 Appendix E 2018 WSDOT Monitoring Guidance for In-Water Work
Page 554 Appendix F Guide to Handling Fugitive Dust from Construction Projects
Page 579 Appendix G Noise Exemption Letter
Page 581 Appendix H DNR Road Use Permit - Ten (10) K0 Logs