Beverly Park Road ADA Upgrades & 18th Avenue West Sidewalk Improvements, Snohomish County, WA #RC1785, UPI 21-0048; RC1789, UPI 22-0011 / PW-26-0737SB - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 234 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Notice of Call for Bids
Page 6 Vicinity Map
Page 7 Summary of Quantities
Page 9 Introduction / Special Provisions / Project Proposal
Page 11 Contents
Page 17 Introduction / Special Provisions
Page 18 Introduction to the Special Provisions / Division 1 General Requirements
Page 44 Division 2 Temporary Features
Page 51 Division 3 Earthwork
Page 53 Division 4 Aggregates & Bases
Page 55 Division 5 Surface Treatments & Pavements
Page 65 Division 6 Structures
Page 68 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 70 Division 8 Miscellaneous Construction
Page 87 Division 9 Materials
Page 101 Prevailing Wage Information
Page 102 Benefit Code Key
Page 120 Supplemental to Wage Rates
Page 131 Washington State Prevailing Wage Rates - Snohomish County
Page 179 Project Proposal
Page 207 Appendix B Stormwater Pollution Prevention Plan (SWPPP)
Page 232 Appendix C Beverly Park Road Traffic Signal Plans (As-Built)