SR202 Shared-Use Trail Extension, City of North Bend, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 506 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 5 Call for Bids
Page 7 Part 1 Bid Documents
Page 9 Information and Checklist for Bidders
Page 13 Bid Proposal
Page 21 Bid Proposal Signature Page
Page 22 Non-Collusion Affidavit
Page 23 Local Agency Subcontractor List
Page 24 Contractor Certification / Wage Law Compliance - Responsibility Criteria
Page 25 Bid Security
Page 27 Part 2 Agreement and Bonds
Page 29 Agreement
Page 35 Exhibit A Declaration of Option for Management of Statutory Retained Percentage
Page 37 Exhibit B Retainage Bond
Page 41 Exhibit C Tax Identification Number
Page 43 Exhibit D Certificate as to Corporate Principal
Page 45 Exhibit E Performance Bond
Page 49 Exhibit F Public Works Payment Bond
Page 51 Exhibit G Apprentice Utilization
Page 55 Exhibit H Apprentice Utilization Plan Instructions & Form
Page 59 Part 3 Special Provisions
Page 61 Division 1 General Requirements
Page 63 Introduction to the Special Provisions
Page 64 Division 1 General Requirements
Page 157 Division 2 Earthwork
Page 173 Division 3 Aggregate Production and Acceptance
Page 176 Division 4 Bases
Page 179 Division 5 Surface Treatments and Pavements
Page 215 Division 6 Structures
Page 255 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 271 Division 8 Miscellaneous Construction
Page 298 Division 9 Materials
Page 306 Part 4 Plans (Under Separate Cover)
Page 308 Part 5 Wage Rates
Page 310 Washington State Prevailing Wage Rates - King County
Page 358 Benefit Code Key
Page 376 Part 6 Appendix
Page 378 Appendix A Supplemental Bidder Criteria
Page 392 Appendix B Soil Log Information
Page 428 Appendix C Inadvertent Discovery Plan
Page 440 Appendix D Draft Construction Stormwater General Permit