Well 6/14 Transmission Main, City of Camas, WA #WTR23001 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 66 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 4 Call for Bids
Page 7 Part One - Bidding Documents
Page 8 Bidder's Information Page
Page 9 Bid Proposal
Page 11 Mandatory Bidder Responsibility Criteria Information
Page 12 Subcontractor Mandatory Bidder Responsibility Criteria
Page 13 Bidder's Check List
Page 15 Acknowledgement of Contractor Lawful Hiring Compliance Enrollment
Page 16 Non-Collusion Declaration / Notice to All Bidders
Page 17 Bid Bond Acknowledgement
Page 18 Local Agency Subcontractor List
Page 20 Part Two - Contract Documents
Page 21 Contract
Page 24 Declaration of Option for Investment of Retained Percentage
Page 25 Contract Bond
Page 27 Part Three - Affidavit of E-Verify Compliance
Page 29 Part Four - Amendments to the Standard Specifications
Page 31 Part Five - Special Provisions
Page 32 Introduction to the Special Provisions / Division 1 General Requirements
Page 49 Division 2 / Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 57 Division 8 Miscellaneous Construction
Page 58 Division 9 Materials
Page 63 Part Six - Washington State Hourly Prevailing Wage Rates
Page 64 Part Seven - Construction Plans (Under Separate Cover)
Page 65 Appendix
Page 66 Geotechnical Report (Under Separate Cover)