Medical Center CT Replacement (ED), EvergreenHealth, Kirkland, WA #3644 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 283 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Section 000103 Project Directory
Page 4 Section 000110 Table of Contents
Page 6 Section 000120 List of Schedules
Page 8 Section 001116 Invitation to Bid
Page 10 Section 002113 Instructions to Bidders
Page 11 AIA Document A701-1997 Instructions to Bidders
Page 22 Section 003126 Existing Hazardous Material Information
Page 23 Section 003143 Permit Application
Page 24 Section 004113 Bid Form
Page 28 Section 004313 Bid Bond
Page 29 Section 004513 Bidder Qualifications
Page 32 Section 005213 Agreement Form
Page 33 AIA Document A105-2017 Standard Short Form of Agreement Between Owner and Contractors
Page 54 Section 006276 Application for Payment Form
Page 55 Section 007343 Wage Rate Requirements
Page 56 Section 011000 Summary
Page 60 Section 011011 Contract Time & Sequence
Page 62 Section 012000 Price & Payment Procedures
Page 65 Section 012100 Allowances
Page 67 Section 012300 Alternates
Page 68 Section 012500 Substitution Procedures
Page 72 Section 012600 Contract Modification Procedures
Page 77 Section 013000 Administrative Requirements
Page 84 Section 013101 Electronic Data Release
Page 85 Section 013126 Electronic Communication Protocols
Page 88 Section 013200 Construction Progress Schedule
Page 95 Section 013300 Submittal Procedures
Page 101 Section 013523 Owner Safety Requirements
Page 109 Section 013533 Infection Control Procedures
Page 119 Section 013573 Delegated Design Procedures
Page 122 Section 014000 Quality Requirements
Page 128 Section 014200 References
Page 133 Section 014500 Quality Control
Page 136 Section 015000 Temporary Facilities
Page 147 Section 016000 Product Requirements
Page 153 Section 016016 VOC Content Restrictions
Page 156 Section 017123 Field Engineering
Page 158 Section 017329 Cutting & Patching
Page 164 Section 017400 Cleaning & Waste Management
Page 168 Section 017700 Closeout Procedures
Page 172 Section 017823 Operation & Maintenance Data
Page 178 Section 017836 Warranties
Page 181 Section 017839 Project Record Documents
Page 184 Section 017900 Demonstration & Training
Page 189 Section 019100 General Commissioning Requirements
Page 196 Section 028319 Lead Handling Procedures
Page 209 Section 096516 Vinyl Sheet Flooring
Page 215 Section 099123 Interior Painting
Page 222 Appendix
Page 223 Draft AIA Document G702-1992 Application and Certificate for Payment
Page 224 Draft AIA Document G703-1992 Continuation Sheet
Page 225 COP Summary
Page 229 Section 012500 Substitution Request Form
Page 233 Contractor Quality Control Daily Report
Page 236 Utility Shutdown Request
Page 237 ICRA Site Log
Page 238 Kirkland Campus Parking and Delivery Locations
Page 239 Partial AHERA Survey
Page 248 EvergreenHealth ICRA 2.0 Infection Control Risk Assessment and Permit
Page 254 Interim Life Safety Plan
Page 257 Above Ceiling Access Permit Engineering Services
Page 258 Hot Work Permit
Page 262 Atrium White Color Code on SW
Page 263 Schedule
Page 264 Vendor Supplied Equipment Drawing
Page 283 Haul Route