Trans Mains 1 & 2 Valve Replacement - Phase 4, Alderwood Water & Wastewater District, Everett, WA #W2301D - Plans
G.01 Cover Sheet
G.02 General Notes, Legend & Abbreviations
G.03 Project Map
G.04 Survey Control Plan
EC.01 Site 4-01 - Existing Conditions & Erosion Control - 977-3 (New) - Holly Drive & 3rd Avenue SE
W.01 Site 4-01 - Water Improvements & Restoration - 977-3 (New) - Holly Drive & 3rd Avenue SE
EC.02A Site 4-02A - Existing Conditions & Erosion Control - 917-2 - 3rd Avenue SE & SE Everett Mall Way / SR 99
W.02A Site 4-02A - Water Improvements & Restoration - 917-2 - 3rd Avenue SE & SE Everett Mall Way / SR 99
EC.02B Site 4-02B - Existing Conditions & Erosion Control - 917-2 - 3rd Avenue SE
W.02B Site 4-02B - Water Improvements & Restoration - 917-2 - 3rd Avenue SE
EC.03 Site 4-03 - Existing Conditions & Erosion Control - 816-1 - 3rd Avenue SE & 112th Street SE
W.03 Site 4-03 - Water Improvements & Restoration - 816-1 - 3rd Avenue SE & 112th Street SE
EC.04 Site 4-04 - Existing Conditions & Erosion Control - 717-002 - 3rd Avenue SE & 128th Street SE / SR 96
W.04 Site 4-04 - Water Improvements & Restoration - 717-002 - 3rd Avenue SE & 128th Street SE / SR 96
EC.05 Site 4-05 - Existing Conditions & Erosion Control - 712-6 - Mukilteo Speedway / SR 525
W.05 Site 4-05 - Water Improvements & Restoration - 712-6 - Mukilteo Speedway / SR 525
EC.06 Site 4-06 - Existing Conditions & Erosion Control - 977-4 (New) - 84th Street SE & 7th Avenue SE
W.06 Site 4-06 - Water Improvements & Restoration - 977-4 (New) - 84th Street SE & 7th Avenue SE
EC.07 Site 4-07 - Existing Conditions & Erosion Control - 977-1 - Holly Drive & 3rd Avenue SE
W.07 Site 4-07 - Water Improvements & Restoration - 977-1 - Holly Drive & 3rd Avenue SE
D.01 Snohomish County TESC Notes & Details
D.02 City of Everett TESC Notes & Details
D.03 Water Details
D.04 Water Details
D.05 Water Details
D.06 Water Details
D.07 City of Everett Paving Details
D.08 City of Everett Storm Details
D.09 City of Everett Storm Details
D.10 WSDOT Restoration Details
D.11 City of Everett Channelization Details
D.12 WSDOT Channelization Details
D.13 City of Everett Signal Details
S.01 Site 4-07 - Cast-In-Place Vault - Structural General Notes, Legend & Abbreviations
S.02 Site 4-07 - Cast-In-Place Vault - Structural Special Inspection Matrices
S.03 Site 4-07 - Cast-In-Place Vault - Structural Details
S.04 Site 4-07 - Cast-In-Place Vault - Structural Details
S.05 Site 4-07 - Cast-In-Place Vault - Structural Section, Top of Wall Plan & Foundation Plan
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.