Project #JR3          Bid Date: 11/18/2026 @ 2:00 pm PST

University of Washington Medical Center Energy Upgrades, Seattle, WA

Documents:
Instructions to Bidders and Subcontract Exhibits
Mechanical Plans
Electrical Plans
Specs
Appendix C - TRBM Report

Addendum #1:
Addendum #1 - Exhibit 00.01 - Addendum 1 Summary of Changes
Addendum #1 - Exhibit D - Contract Documents
Addendum #1 - Mechanical Plans
Addendum #1 - Electrical Plans

Addendum #2:
Addendum #2 - Exhibit 00.02 - Addendum 2 Summary of Changes
Addendum #2 - Exhibit D - Contract Documents
Addendum #2 - Questions & Answers Log
Addendum #2 - Pre-Bid Walk Sign-In Sheets

Register as a Bidding Subcontractor and be notified of new docs on this project.

Builders Exchange of Washington, Inc. Subs and Suppliers

Bids to:
Abbott Construction LLC
3408 1st Ave South
Seattle, WA 98134
206-467-8500

Contact: Garry Fulghum
garry.fulghum@abbottconstruction.com

Description:
The University of Washington Medical Center – Montlake Campus (UWMC ML) Energy Efficiency Project was initiated to improve the energy performance while reducing greenhouse gas (GHG) emissions. The project focuses on targeted upgrades to existing air handling units, supply and exhaust fans, and associated mechanical equipment throughout the Montlake Campus. These improvements are intended to improve system efficiency, enhance operational reliability, and reduce the facility's energy consumption while maintaining the high level of resiliency required for a critical healthcare environment. Specific scope of work includes damper, valve, motor, VFD replacements and control upgrades of existing air handling units and exhaust fans. System will require extensive shutdowns and coordination to maintain operations to the existing hospital facility. Scopes of work expected are mechanical, electrical and hazardous material abatement.

Bid Packages:
BP-02.01 HAZARDOUS MATERIAL ABATEMENT $500,000
BP-23.01 MECHANICAL $2,500,000
BP-26.01 ELECTRICAL $500,000