Bellevue Issaquah Pipeline Relocation at Lewis Creek, Cascade Water Alliance, Issaquah, WA20270108
$2,292,560
Plans
Specs
WSDOT Permit
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Cascade Water Alliance
11400 SE 8th Street, Suite 400
Bellevue, WA 98004
BIPatLewisCreek@cascadewater.org
Contact: Will Smythe
wSmythe@cascadewater.org
Issued by:
www.bxwa.com
Prebid: 12/2 @ 10:00 am at project location, southeastern corner of Lakemont Blvd SE and SE Newport Way (47°33'45.2"N 122°05'53.9"W)
Notes:
Bid Opening Information: @ 10:00 am
One tap mobile: US: +12532158782,,88489995339#
or +12532050468,,88489995339#
Meeting URL:
https://us06web.zoom.us/j/88489995339?pwd=PKMOWW9VJ
vkJbT4jMMrI3CAD8mRIiA.1&from=addon
Passcode: 120222
Description:
The Bellevue-Issaquah Pipeline (BIP) Relocation at Lewis Creek Project consists of relocating a portion of Cascade Water Alliance’s existing 24-inch-diameter, high-pressure ductile iron water transmission main that conflicts with Washington State Department of Transportation (WSDOT) improvements at Lewis Creek near I-90 and SE Newport Way. The BIP is a critical regional transmission facility operating at pressures exceeding 200 psi, and continuity of water service is a key requirement during construction. The Work generally includes installation of approximately 300 linear feet of new 24-inch ductile iron water main; installation of portions of the new main within 36-inch steel casing, including a casing suspended beneath the proposed bridge; construction and operation of a temporary 16-inch HDPE bypass; installation of insertion valves, tapping sleeves, valves, Flex-Tend fittings, and appurtenances; connections to the existing BIP; abandonment of portions of the existing pipeline; and associated excavation, backfill, surface restoration, traffic control, testing, disinfection, and related work. Construction must be closely coordinated with WSDOT and its design-build contractor, Atkinson, because the pipeline relocation occurs within the limits of the WSDOT I-90 Fish Passage Project and WSDOT right-of-way.