Renton High School Replacement - MACC 04, Renton, WA - Addendum #2    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 527 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Addendum #2
Page 4 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #01F - Final Clean
Page 8 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #07A - Roofing
Page 13 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #07F - Exterior Siding - Metal Panels
Page 17 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #08D - Aluminum, Glass, & Curtainwall
Page 23 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #09A - Framing & Drywall
Page 33 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #09D - Flooring - Resilient & Carpet
Page 37 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #09E - Acoustic Ceilings & Panels
Page 41 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #09H - Wood Athletic Flooring
Page 45 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #10Z - Miscellaneous Specialties
Page 53 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #11A - Food Service Equipment
Page 58 Exhibit A Scope of Work / Supply and Clarifications / Qualifications - Bid Package #11G - Theater and Stage Equipment
Page 63 Bidder Questions
Page 70 Question #51 Attachment - Carpet Number Table
Page 71 Questions #115-116 Attachment - CPT 01A
Page 80 Questions #115-116 Attachment - CPT 02A
Page 89 Questions #115-116 Attachment - CPT 03
Page 94 Questions #132 Attachment - House Lighting Fixture Schedule
Page 96 Substitution Requests
Page 97 Architect's Addendum #2
Page 139 Section 000110 Table of Contents
Page 148 Section 014000 Quality Requirements
Page 153 Section 014010 Air Barrier System Procedures and Testing
Page 157 Section 018119 Indoor Air Quality Requirements
Page 161 Section 033000 Cast-In-Place Concrete
Page 180 Section 042000 Unit Masonry
Page 193 Section 055000 Metal Fabrications
Page 207 Section 062000 Finish Carpentry
Page 214 Section 072100 Thermal Insulation
Page 222 Section 074213 Metal Wall Panels
Page 229 Section 074247 Ultra High Performance Concrete (UHPC) Facade Panels
Page 237 Section 084313 Aluminum-Framed Storefronts
Page 247 Section 085621 Transaction Windows
Page 251 Section 088000 Glazing
Page 266 Section 090001 Finish Legend
Page 274 Section 095426 Suspended Wood Ceilings
Page 281 Section 096500 Resilient Flooring
Page 289 Section 096723 Resinous Flooring
Page 294 Section 096813 Tile Carpeting
Page 300 Section 099123 Interior Painting
Page 314 Section 102113 Toilet Compartments
Page 317 Section 116143 Stage Curtain Systems
Page 321 Section 134853 Seismic Anchorage Requirements
Page 325 Section 224000 Plumbing Fixtures
Page 341 Section 230910 Fault Detection and Diagnostics System
Page 345 Section 230923.1 Direct-Digital Control System for Plumbing and HVAC
Page 388 Section 230993 Sequence of Operations for HVAC Controls
Page 470 Section 233113 Metal Ducts
Page 484 Section 260533 Raceway
Page 488 Section 272000 Data and Voice Infrastructure
Page 511 Section 316613 Aggregate Pier Ground Improvements
Page 518 Section 323113 Chain Link Fences and Gates
Page 522 Appendix E Archaeological Monitoring Support Requirements During Ground Disturbance Renton High School Phase 2 Construction
Page 526 Appendix F Clarification to Appendix E - Area of Archaeological Sensitivity