Bellevue Issaquah Pipeline Relocation at Lewis Creek, Cascade Water Alliance, Issaquah, WA20270108 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 170 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Part I Bidding Requirements & Forms
Page 4 Invitation to Bid
Page 7 Bid Form
Page 9 Schedule of Prices
Page 11 Bidder Qualification Certificate
Page 13 RCW 39.30.060 Subcontractor List
Page 15 Subcontractor List - HVAC, Plumbing & Electrical
Page 16 Subcontractor List - Structural Steel & Rebar Installation
Page 17 Certification of Compliance with Wage Payment Statutes
Page 18 Bid Guaranty Bond
Page 19 Part II Contract Forms
Page 20 Agreement
Page 22 Performance Bond
Page 25 Payment Bond
Page 28 Part III Special Provisions & Specifications
Page 29 Table of Contents
Page 33 Introduction to the Special Provisions
Page 34 Division 1 General Requirements
Page 93 Division 2 Temporary Features
Page 97 Division 3 Earthwork
Page 99 Division 4 Aggregates & Bases
Page 100 Division 5 Surface Treatments & Pavements
Page 127 Division 6 Structures
Page 130 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 139 Division 8 Miscellaneous Construction
Page 140 Division 9 Materials
Page 141 Part IV Appendices & Reference Materials
Page 142 Appendix A Temporary Erosion & Sediment Control Plan - I-90, Lewis & West Village Park & Schneider Creeks Pish Passage Project - SE Newport Way
Page 153 Appendix B Permits (Under Separate Cover)
Page 156 Part V Contract Plans